800 kW Air Cooled Chiller | Chiller Rental | Aggreko Middle East
 
Middle East Contact Us English

800 kW air cooled chiller

Technical Data

PERFORMANCE DATA (COOLING)
Design capacity
Design leaving fluid temperature
Min/Max ambient template
Unit
kW
°C
°C
Value
778
6
-18/50
ELECTRICAL DATA
Design supply
Recommended generator set
Unit
380-415V/3ph
KVA
Value
50Hz
500
NOISE DATA
Sound pressure level at 10m
Unit
dB(A)
Value
69
EVAPORATOR DATA
Design flow
Min/Max flow
Unit
l/s
l/s
Value
31.4
16/50
CONDENSER DATA
Number of fans
Total air flow rate
Unit
 
m³/s
Value
10
63
REFRIGERANT DATA
Type
Number of circuits
Unit
 
 
Value
R134a
2
PHYSICAL DATA
Overall length
Overall width
Overall height
Weight
Connections
Unit
m
m
m
kg
in
in
Value
6.05
2.43
2.60
9050
6"Flanged
4"Camlock

Features

Designed and assembled to Aggreko's standards

Unit base and frame made from heavy-gauge steel

Energy-efficient design

Broad temperature control range

Fork lift pockets and corner castings

New-generation refrigerants

Benefits

Safe and reliable operation for rental applications

Extra strength and durability, dynamic stability

Reduced total cost of operation

Suits a wide variety of applications

Safe, balanced lifting and placing in tight places

Zero ozone-depletion potential, reduced global warming potential

Fully engineered TC rental solutions

Aggreko provides a full engineering, design and installation service to ensure the temperature needs of your process, facility, project, event or people are effectively met during any maintenance, breakdown, productivity improvement, seasonal heat and comfort cooling requirement conditions.

With a team of experienced and dedicated TC specialists, Aggreko has the expertise to deliver complex temporary TC solutions across a diverse range of industries including HVAC, refining and petrochemical, manufacturing, food and beverage, mining, utility, construction, cold storage and events.

Aggreko Process Services (APS)

Aggreko Process Services (APS) is the specialist arm of Aggreko that focuses on TC solutions specifically for process industries. APS targets process limitations caused by high ambient temperatures or underperforming equipment that impact process plant output. Bespoke solutions delivered by APS include onsite engineering studies, process design package, full project management and recommendations for future improvements at the end of the project.

Product Information

Full range of TC equipment

Enquire about product

  • cooling-towers-270

    Case study

    Palazzo Versace Dubai

    Aggreko Dubai was contracted to provide temporary power and cooling solutions during completion work on the interior of hotel buildings in Dubai Creek.

    Cooling of luxury hotel
  • cooling-towers-petrochem-kuwait-270

    Case study

    D1 Tower

    Aggreko provided two 200TR air cooled chillers for interior fit out phase of a 280m tall landmark tower building's construction at Dubai creek.

    Cooling Luxury Developments
  • metro-tunnel-270

    Case study

    Emirates Steel

    Aggreko was chosen to supply a 20 MW cooling tower package to a major steel plant.

    Cooling for steel plant
  • kazachstan-petrochemical-cooling-270

    Case study

    Tamkeen (New York University)

    Aggreko provided a cooling solution of 4000TR chilled water to enable wild air process cooling for university facilities in Abu Dhabi, UAE

    Cooling university facilities
  • food-and-beverages-cooling-270

    Case study

    AL Shaqab Equestrian Show

    Aggreko provided cooling for stables and show tents for a major equestrian show in Qatar.